Skip to content
Scroll horizontally or use the Tab key to reach every navigation link.
News hub

Transport

SH6 Albert Town Bridge near Wānaka closed overnight 16 to 18 November

Albert Town Bridge on SH6 near Wānaka is closed to vehicles from 10pm to 6am on the nights of Monday 16, Tuesday 17 and Wednesday 18 November 2026, QLDC says. It is open by day, walkers and cyclists can always cross, and the detour runs via Camp Hill Road, Kane Road and Red Bridge.

Monday, 16 November 2026Transport1 sourceSources checked
Paper model scene of a bridge at night with a barrier and digger, a cyclist crossing and a car on a riverside detour

From this dated report

Driving between Wānaka and Lake Hāwea late at night? Cross Albert Town Bridge before 10pm or allow extra time for the Red Bridge detour, and check NZTA's Journey Planner before you set off.

Key facts

  1. Fact 01

    The bridge is open to traffic from 6am to 10pm, and walkers and cyclists can cross at all times.

  2. Fact 02

    The QLDC detour runs via Camp Hill Road, Kane Road, Red Bridge and the SH6 Wānaka to Luggate Highway.

  3. Fact 03

    QLDC says more than 20km of new wastewater pipeline between Lake Hāwea and Albert Town is already installed.

Albert Town Bridge on State Highway 6 near Wānaka is closed to vehicles overnight on Monday 16, Tuesday 17 and Wednesday 18 November 2026, from 10pm to 6am each night. Queenstown Lakes District Council (QLDC) says the bridge stays open during the day, from 6am to 10pm, and that walkers and cyclists can cross at all times. We read QLDC's project page and NZTA's Journey Planner listing for the closure on the morning of 16 November.

QLDC says the closure is for the final connection on its new wastewater pipeline between Lake Hāwea and Albert Town. More than 20km of pipe is already in the ground, including the crossing beneath the bridge, but one connection on the Lake Hāwea side needs digging across the full width of the bridge approach, so the work is being done at night when traffic is lightest.

For drivers, QLDC names a detour via SH6 Albert Town to Lake Hāwea Road, Camp Hill Road, Kane Road, Red Bridge and the SH6 Wānaka to Luggate Highway, and asks people to allow extra time. If you plan to cross before the closure, aim to reach the bridge at least 10 minutes before 10pm so queued traffic can clear. When it reopens at 6am, traffic management and reduced speed limits stay in place while the work area is made safe for normal traffic. Heavy and over dimension vehicles have a separate detour via Hāwea Dam, Domain Road, Cemetery Road and Gladstone Road, because QLDC says Camp Hill Road Bridge is not rated for HPMV 50Max loads or heavier.

If you are driving over from Queenstown, our Queenstown to Wānaka drive guide covers the route, and our things to do in Wānaka guide helps you plan the daytime hours when the bridge is open.

Questions visitors are asking

When is Albert Town Bridge near Wānaka closed?

Albert Town Bridge on SH6 near Wānaka is closed to vehicles overnight on Monday 16, Tuesday 17 and Wednesday 18 November 2026, from 10pm to 6am each night. QLDC says the bridge is open during the day, from 6am to 10pm, and walkers and cyclists can cross at all times.

What is the detour when Albert Town Bridge is closed?

QLDC names a detour via SH6 Albert Town to Lake Hāwea Road, Camp Hill Road, Kane Road, Red Bridge and the SH6 Wānaka to Luggate Highway. Allow extra time for the journey. Heavy and over dimension vehicles use a separate route via Hāwea Dam, Domain Road, Cemetery Road and Gladstone Road.

Why is Albert Town Bridge closing at night?

QLDC is finishing the last connection on its new wastewater pipeline between Lake Hāwea and Albert Town. One connection on the Lake Hāwea side needs digging across the full width of the bridge approach, so the bridge near Wānaka closes for three nights, when traffic volumes are at their lowest.

Can I walk or cycle over Albert Town Bridge during the closure?

Yes. QLDC says pedestrian and cyclist access over Albert Town Bridge near Wānaka is maintained at all times, including during the overnight vehicle closures from 10pm to 6am on 16, 17 and 18 November 2026. Follow the signs and any directions from traffic management staff at the work site.